CCS Site Management 2 — Questions and Answers
Question 1: Which document establishes the contractor's plan for managing construction waste on a project site?
- Waste Management Plan (Correct answer)
- Site Safety Plan
- Quality Control Plan
- Environmental Impact Statement
Correct answer: Waste Management Plan
A Waste Management Plan outlines how construction debris will be sorted, recycled, or disposed of on site.
Question 2: What is the primary purpose of a pre-construction survey of adjacent properties?
- To assess rental value of neighboring buildings
- To document existing conditions and prevent future liability claims (Correct answer)
- To determine property lines for fencing
- To identify potential subcontractors in the area
Correct answer: To document existing conditions and prevent future liability claims
Pre-construction surveys document existing damage to neighboring properties so the contractor is not held liable for pre-existing conditions.
Question 3: A contractor discovers unmarked underground utilities during excavation. What is the FIRST action to take?
- Continue excavation carefully using hand tools
- Stop work and notify the owner and utility company (Correct answer)
- Backfill the area and reroute the excavation
- Call 811 after the fact to report the find
Correct answer: Stop work and notify the owner and utility company
Work must stop immediately upon discovering unmarked utilities, and the owner and relevant utility companies must be notified.
Question 4: Which specification section typically addresses temporary erosion and sediment control measures?
- Division 01 — General Requirements
- Division 02 — Existing Conditions
- Division 31 — Earthwork (Correct answer)
- Division 33 — Utilities
Correct answer: Division 31 — Earthwork
Temporary erosion and sediment control measures are typically specified in Division 31 under Earthwork sections.
Question 5: What is the function of a Stormwater Pollution Prevention Plan (SWPPP)?
- To design permanent drainage infrastructure for the site
- To identify pollutant sources and practices to reduce stormwater contamination during construction (Correct answer)
- To establish a schedule for permanent landscaping installation
- To document the contractor's insurance for flood damage
Correct answer: To identify pollutant sources and practices to reduce stormwater contamination during construction
A SWPPP identifies potential pollutant sources on a construction site and establishes best management practices to prevent stormwater contamination.
Question 6: When a geotechnical report recommends over-excavation and replacement, the specifier should ensure the specification addresses:
- Dewatering pump capacity requirements only
- Material type, compaction requirements, and testing frequency for fill (Correct answer)
- Blasting procedures for rock removal
- Formwork design for grade beams
Correct answer: Material type, compaction requirements, and testing frequency for fill
Over-excavation and replacement specifications must define acceptable fill material, required compaction density, lift thickness, and testing protocols.
Question 7: Which party is typically responsible for locating underground utilities before excavation begins?
- The architect of record
- The structural engineer
- The contractor (Correct answer)
- The local municipality
Correct answer: The contractor
The contractor is responsible for contacting utility locating services (e.g., 811 in the US) and verifying utility locations before commencing excavation.
Which document establishes the contractor's plan for managing construction waste on a project site?