A CRM dashboard shows that a consulting meteorologist's average case cycle time increased from 45 to 90 days over six months. The most likely operational cause to investigate is:
-
A
A bottleneck in the data analysis or report drafting stage
-
B
An increase in the number of sunny days nationally
-
C
A decrease in the CRM software's color theme quality
-
D
A reduction in the number of thunderstorms during the period