Quality, Safety & Risk Management Flashcards

7 cards from real CCM practice questions. Tap to flip, then mark Knew It or Still Learning โ€” missed cards come back until you master them.

Read the first 7 Quality, Safety & Risk Management flashcards as text
  1. Which OSHA standard specifically governs safety requirements for construction industry workers in the United States?

    Answer: 29 CFR Part 1926

    29 CFR Part 1926 is OSHA's construction industry safety standard, covering hazards specific to construction worksites.

  2. A contractor discovers that installed concrete has a compressive strength 15% below specification. Under a quality management system, what is the FIRST step?

    Answer: Issue a nonconformance report and quarantine the affected area

    Issuing a nonconformance report (NCR) and quarantining the work is the first formal step to document and control the deficiency before deciding on disposition.

  3. In risk management, what does the term 'risk appetite' describe?

    Answer: The level of risk an organization is willing to accept in pursuit of objectives

    Risk appetite is the amount and type of risk an organization is willing to pursue or retain in order to achieve its strategic objectives.

  4. Which safety metric measures the number of OSHA recordable incidents per 200,000 hours worked?

    Answer: Total Recordable Incident Rate (TRIR)

    The Total Recordable Incident Rate (TRIR) normalizes recordable incidents per 200,000 hours to allow comparison across companies of different sizes.

  5. A risk register entry shows Impact = High and Probability = Low. What risk response strategy is MOST appropriate for this scenario?

    Answer: Transfer the risk through insurance or contract clauses

    High-impact, low-probability risks are typically best managed by transferring them (e.g., via insurance) so the financial consequence is borne by another party if the event occurs.

  6. What is the primary purpose of a Pre-Task Plan (PTP) in construction safety management?

    Answer: To outline site-specific hazards and controls before a specific task begins

    A Pre-Task Plan identifies job-specific hazards and the controls workers will implement before starting work, making it a proactive safety tool.

  7. Under the CMAA Body of Knowledge, which document formally defines the quality standards and inspection procedures applicable to a construction project?

    Answer: Quality Management Plan

    The Quality Management Plan establishes quality standards, responsibilities, processes, and inspection/test procedures for a specific project.