  1. What is embodied carbon in the context of construction sustainability?

    Answer: Greenhouse gas emissions from material manufacturing, transport, and construction activities

    Embodied carbon refers to greenhouse gas emissions associated with manufacturing, transporting, and installing construction materials throughout the building lifecycle.

  2. What does a Spill Prevention, Control, and Countermeasure (SPCC) plan address on construction sites?

    Answer: Prevention of oil discharges that could reach navigable waters

    An SPCC plan is required by the EPA to prevent oil spills from reaching navigable waters or adjoining shorelines, applicable to sites with oil above threshold quantities.

  3. What is the primary purpose of erosion and sediment control measures on a construction site?

    Answer: To prevent disturbed soil and debris from entering nearby waterways

    Erosion and sediment controls protect water quality by preventing disturbed soil and construction debris from washing into nearby waterways.

  4. Which energy efficiency standard is most commonly referenced for commercial building envelope design in the US?

    Answer: ANSI/ASHRAE Standard 90.1

    ANSI/ASHRAE 90.1 sets minimum energy efficiency requirements for building envelopes and mechanical systems in commercial buildings and is widely adopted in US building codes.

  5. What defines a net zero energy building?

    Answer: A building that produces as much energy from renewable sources as it consumes annually

    A net zero energy building balances its annual energy consumption with an equivalent amount of renewable energy produced on-site or off-site.

  6. Which Section of the Clean Water Act requires a permit from the Army Corps of Engineers before dredging or filling wetlands?

    Answer: Section 404

    Section 404 of the Clean Water Act requires a permit from the Army Corps of Engineers for any discharge of dredged or fill material into waters of the US, including wetlands.