Under the IRC, a building permit becomes invalid if authorized work is not commenced within what period after issuance?
Answer: 180 days
IRC R105.5 voids permits when work does not begin within 180 days.
Which structure is typically exempt from a building permit under the IRC?
Answer: A one-story detached accessory structure of 200 sq ft or less
IRC R105.2 exempts one-story detached accessory structures not exceeding 200 square feet.
Under the IRC permit exemptions, fences do not require a permit if they do not exceed what height?
Answer: 7 feet
IRC R105.2 exempts fences not over 7 feet high.
Who has the authority to issue a stop work order when work is being performed contrary to the code?
Answer: The building official
IRC R114.1 authorizes the building official to issue stop work orders.
A retaining wall is exempt from permit under the IRC if it is not over what height, measured from the bottom of the footing to the top of the wall, unless supporting a surcharge?
Answer: 4 feet
IRC R105.2 exempts retaining walls 4 feet or less unless supporting a surcharge.
When must a footing inspection be performed?
Answer: After excavation and forms are erected, but before concrete is placed
IRC R109.1.1 requires footing inspections after trenches are excavated and forms erected, before concrete placement.
What document issued by the building official authorizes a building to be used or occupied after final approval?
Answer: Certificate of occupancy
IRC R110 and IBC 111 require a certificate of occupancy before use or occupancy.