  1. During which phase of the Software Testing Life Cycle (STLC) are the specific test cases and scripts developed?

    Answer: Test Design

    The Test Design phase is where testers create detailed test cases and test scripts based on the test objectives and requirements identified during the Test Planning phase. Test Planning involves defining the strategy, Test Execution is running the tests, and Test Closure involves summarizing and reporting on the testing effort.

  2. During a review meeting, the author of the requirements document presents the material to the development and testing teams, explaining their thought process to achieve a common understanding and gather feedback. Which type of review is being conducted?

    Answer: Walkthrough

    A walkthrough is a review process where the author of the work product guides the participants through the document to achieve a common understanding, gather feedback, and build consensus. It is typically author-led and less formal than an inspection.

  3. What is the main purpose of 'exploratory testing' within an Agile sprint?

    Answer: To simultaneously learn about the system, design tests, and execute them without rigid scripts

    Exploratory testing combines learning, test design, and execution simultaneously, making it highly effective for discovering unexpected issues quickly in sprints.

  4. A tank holds 150 gallons and drains at 12.5 gallons per minute. How long until it is empty?

    Answer: 12 minutes

    150 ÷ 12.5 = 12 minutes.

  5. During the initial test planning phase for a project with many uncertainties and new technologies, which estimation technique would be most appropriate for leveraging the collective knowledge of senior testers and subject matter experts?

    Answer: Wideband Delphi

    The Wideband Delphi technique is a consensus-based estimation method that gathers and discusses estimates from a group of experts. This iterative approach is particularly useful for projects with high uncertainty, as it allows for the sharing of knowledge and rationale among experts to arrive at a more realistic estimate.

  6. What is a key challenge when testing in short Agile sprints of one to two weeks?

    Answer: Balancing the execution of new feature tests with maintaining the regression suite within a compressed timeframe

    Short sprints require testers to write, execute, and automate new tests while keeping the regression suite manageable—all within the same iteration.

  7. A transformer steps voltage down by a 4:1 ratio. If the input is 480 volts, what is the output?

    Answer: 120 volts

    480 ÷ 4 = 120 volts.

  8. In a risk-based testing strategy, which two factors are primarily used to assess and prioritize risks?

    Answer: Likelihood of failure and impact of failure

    Risk-based testing prioritizes testing efforts based on the potential risk of failure and the impact that failure would have on the business or users. The combination of likelihood (probability) and impact (severity) determines the overall risk level, guiding the test strategy.

  9. What is the smallest amount of force required to lift the weight?

    Answer: 15 kg

    To determine how much force is required to lift the weight, determine how many sections of the rope are bearing the weight and divide the weight among them. 30/ 2 = 15 kg

  10. A tester is verifying that a new e-commerce website can handle 1,000 concurrent users without a significant decrease in performance. What type of testing is being performed?

    Answer: Performance Testing

    Performance testing is a non-functional testing type that evaluates how a system performs in terms of responsiveness and stability under a particular workload. This scenario is directly concerned with the system's behavior under load, which is the focus of performance testing. Functional testing checks features, usability testing checks ease of use, and regression testing checks for new bugs in existing features.

  11. Which formula correctly calculates Defect Removal Efficiency (DRE)?

    Answer: DRE = Defects found before release / (Defects found before + after release) × 100%

    DRE measures the percentage of total defects that were caught before product delivery to the customer.

  12. A light car and a heavy truck approach each other at the same speed. Will they travel in which direction if they collide?

    Answer: Left

    According to the principle of conservation of momentum, the total momentum of the system before a collision equals the total momentum after. Since the heavy truck has significantly more mass than the light car, even though they have the same speed, the truck possesses a greater magnitude of momentum. Consequently, after they collide, the combined wreckage will continue to move in the initial direction of the heavier truck, which is 'Left' in this scenario.

  13. What is the main purpose of a software process improvement (SPI) initiative?

    Answer: To systematically enhance the effectiveness and efficiency of software development processes

    SPI aims to make development processes more effective, predictable, and efficient through structured improvement activities.

  14. Find the next term: 3, 9, 27, 81, ___.

    Answer: 243

    Each term is multiplied by 3, so 81×3=243.

  15. A project is facing a tight deadline, and the test team needs to prioritize its efforts. What is the PRIMARY factor that should guide the prioritization of test cases?

    Answer: The risk associated with each feature or requirement.

    Risk-based testing is a fundamental principle of test management. Prioritizing tests based on the potential impact and likelihood of failure (risk) ensures that the most critical areas of the application are tested first and most thoroughly. This approach maximizes the effectiveness of the testing effort, especially under constraints.

  16. How much force does it take to lift the weight?

    Answer: 70 kg

    Because there is only one load bearing section of rope, the force required to lift the weight is the same as the weight itself. The answer is 70 kg.

  17. What is 'test efficiency' as a metric in software testing?

    Answer: The number of bugs found divided by total hours spent testing

    Test efficiency measures how many defects are found per unit of testing effort, helping evaluate the value of testing activities.

  18. What does 'continuous testing' mean in a DevOps or Agile pipeline?

    Answer: Executing automated tests at every stage of the delivery pipeline to provide rapid feedback

    Continuous testing integrates automated tests into the CI/CD pipeline so that every code change triggers immediate quality feedback.

  19. Which of the following defects is MOST likely to be discovered by static analysis tools rather than by dynamic testing?

    Answer: A section of code that can never be reached during execution.

    Static analysis tools examine the code without executing it and are excellent at finding structural issues like dead or unreachable code. Memory leaks, incorrect calculations, and performance issues are typically behavioral or runtime problems discovered through dynamic testing.

  20. When two testers report the same underlying issue separately, the later report should be marked as what?

    Answer: Duplicate

    A second report of an already-logged issue is closed as a 'Duplicate' and linked to the original.

How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. seo.nlx.org — Passing score, time limit · verified Oct 2026
  2. pge.com — Retake policy · verified Oct 2026
  3. eei.org — Test delivery, eligibility, score release, score validity · verified Oct 2026