A CAPS client lives in a flood-prone area and uses powered medical equipment. Which risk mitigation measure should be incorporated into the home modification plan?
-
A
Relocating all electrical outlets to floor level for easier access
-
B
Elevating critical electrical panels and medical equipment above the base flood elevation
-
C
Installing ground-fault circuit interrupters (GFCIs) only in bathrooms
-
D
Using extension cords to allow flexible placement of medical equipment