  1. Which quality management tool is used to determine whether a process is stable or has predictable performance?

    Answer: Control chart

    A control chart is used to determine whether a process is in control (stable) or out of control, helping distinguish common cause variation from special cause variation.

  2. What does a scatter diagram show in quality management?

    Answer: The relationship between two variables

    A scatter diagram plots two variables to show whether a correlation (positive, negative, or none) exists between them.

  3. According to the PMBOK Guide, which of the following is an output of the Plan Quality Management process?

    Answer: Quality metrics

    Quality metrics—specific measures of a product attribute and how to measure it—are a key output of the Plan Quality Management process.

  4. The concept of 'prevention over inspection' in quality management means:

    Answer: Building quality into the process rather than inspecting it in at the end

    Prevention over inspection means designing processes and work practices that avoid defects rather than relying on end-stage inspections to catch them.

  5. What is the primary purpose of a quality audit in project management?

    Answer: To identify inefficient or ineffective policies and processes being used

    A quality audit is a structured, independent review to determine whether project activities comply with organizational and project policies and processes.

  6. In the PMBOK Guide, 'verified deliverables' are an output of which process?

    Answer: Control Quality

    Verified deliverables are an output of Control Quality, confirming that deliverables have been inspected and meet quality requirements before scope validation.