Emergency Preparedness & Risk Management Flashcards
6 cards from real BOMA practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.
Read the first 6 Emergency Preparedness & Risk Management flashcards as text
What is a 'crisis communications plan' in commercial building management?
Answer: A plan for communicating with tenants, media, and stakeholders during and after an emergency
A crisis communications plan defines who speaks for the building, what messages to communicate, and how to reach tenants, media, and other stakeholders during and after an emergency.
What does 'property damage insurance' (also called 'commercial property insurance') typically cover for a building owner?
Answer: Physical damage to the building structure and contents from covered perils like fire and windstorm
Commercial property insurance covers physical damage to the building structure and owner-owned personal property from covered perils such as fire, windstorm, vandalism, and certain water damage.
What is 'CPTED' (Crime Prevention Through Environmental Design) applied to commercial buildings?
Answer: Design strategies that deter crime by controlling sight lines, access, lighting, and territorial definition
CPTED uses design principles—natural surveillance, access control, territorial reinforcement, and maintenance—to reduce crime opportunities and improve safety perceptions.
What is 'umbrella liability insurance' in the context of commercial building risk management?
Answer: Excess liability coverage that kicks in when primary liability insurance limits are exhausted
Umbrella liability insurance provides additional coverage above the limits of underlying primary liability policies, protecting against catastrophic liability claims that exceed primary limits.
What is the purpose of a 'post-occupancy evaluation' (POE) after tenants move into a commercial space?
Answer: To assess how well the space performs against occupant needs and expectations after they've occupied it
A POE systematically evaluates how well a completed space meets the needs of its occupants, informing design improvements for future projects and addressing deficiencies.
What is 'mold remediation' guidance under BOMA and EPA standards for commercial buildings?
Answer: Remove mold and correct moisture sources; avoid spreading spores; use appropriate PPE; verify remediation success
EPA and industry guidance emphasize correcting moisture sources, safely removing contaminated materials with appropriate containment and PPE, and verifying successful remediation before reoccupancy.
How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- boma.org — Eligibility, score validity, test delivery, exam format, retake policy, score release, time limit, fees · verified Oct 2026