BEE - Bachelor of Electrical Engineering Practice Test

BEE Power Systems and Machines 3

Free · Instant Results

A 50 MVA, 11 kV synchronous generator has a subtransient reactance of 0.15 pu. What is the subtransient fault current (in pu) for a three-phase bolted fault at its terminals?
▶ Start Practice Test