Risk Assessment & Impact Analysis Flashcards
7 cards from real BCI practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.
Read the first 7 Risk Assessment & Impact Analysis flashcards as text
Which technique uses a structured 'what-if' approach to systematically identify potential failure modes in a business continuity context?
Answer: HAZOP (Hazard and Operability Study)
HAZOP systematically examines processes using guide words to identify deviations that could cause disruptions.
In a Business Impact Analysis, what does the term 'single point of failure' refer to?
Answer: A component whose failure causes the entire system or process to stop functioning
A single point of failure is any non-redundant element whose failure would halt the entire dependent system or process.
The BCI Good Practice Guidelines recommend that BIA data should be validated by:
Answer: Senior management and process owners, not just IT
BIA outputs must be validated by process owners and senior management to ensure accuracy and business relevance.
Which risk treatment option involves accepting the potential consequences of a risk without taking mitigating action?
Answer: Risk retention
Risk retention (or acceptance) means the organization consciously decides to absorb the impact if the risk materializes.
When conducting a BIA, 'interdependency mapping' is used to:
Answer: Identify upstream and downstream dependencies that could amplify disruption impact
Interdependency mapping reveals how a disruption to one process can cascade to affect other connected processes.
What is the primary purpose of a Maximum Tolerable Period of Disruption (MTPD)?
Answer: To define the absolute time limit beyond which business viability is threatened
MTPD is the outer boundary of acceptable disruption, after which the organization may not be able to survive as a going concern.
In risk assessment, 'inherent risk' differs from 'residual risk' in that inherent risk is:
Answer: The risk level before any controls are applied
Inherent risk is the raw, uncontrolled risk level; residual risk is what remains after controls are implemented.
How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- thebci.org — Test delivery, renewal, retake fee, retake policy, score release, score validity, eligibility, exam format, passing score, test dates · verified Oct 2026