In a connection problem, Shape 1 is a square with a dot at one of its CORNERS, and Shape 2 is a pentagon with a dot at the MIDPOINT of one of its sides. A line joins the two dots. Four answer drawings show the square and pentagon rotated to different angles. Which drawing must be rejected even if it looks right overall?
Answer: The line attaches to the pentagon at one of its vertices instead of the middle of a side
In connection items, the line has to meet each shape at the same kind of spot shown in the problem. Rotating a shape (so a square looks like a diamond) and changing the line's length or angle are both allowed. Moving the pentagon's attachment from the midpoint of a side to a vertex changes the connection, so that drawing is wrong.
A full circle is cut into three wedge-shaped pieces. One wedge has a 120° central angle and another has a 90° central angle. Which third piece is needed to finish the circle with no gaps or overlaps?
Answer: A wedge with a 150° central angle
A full circle is 360°. The two wedges you have total 120° + 90° = 210°, so the missing wedge must cover 360° − 210° = 150°. The 135° wedge is a close-looking distractor that would leave a 15° gap.
A problem shows an L-shaped piece whose short leg points to the RIGHT, plus two other pieces. One answer choice uses an L-shape whose short leg points to the LEFT, and it can't be rotated into the original. In standard ASVAB Assembling Objects scoring, how should you treat that choice?
Answer: Reject it, because it's a mirror image (a flipped piece), not a rotation of the original
Pieces may be rotated in the plane, but a mirror-image (flipped) version counts as a different piece. If no amount of rotation turns the left-pointing L into the right-pointing L, it's a reflection, and test writers often use reflections as distractors.
A 4×4 square grid (16 unit squares) is to be built from these pieces: a 2×3 rectangle, a T-shaped piece of 4 unit squares, an L-shaped piece of 4 unit squares, and one missing piece. Going by area alone, which piece must the missing one be?
Answer: A domino (2 unit squares in a row)
The grid holds 16 unit squares. The pieces you have cover 6 + 4 + 4 = 14, so the missing piece must cover exactly 2 unit squares, which is a domino. Checking total area quickly rules out pieces that are too small or too large.
A regular hexagon can be split into 6 identical equilateral triangles. You're given a trapezoid made of 3 of those triangles and a rhombus made of 2 of them. Which single piece completes the hexagon exactly?
Answer: One equilateral triangle
The hexagon is 6 triangle units. The trapezoid (3) plus the rhombus (2) make 5, so exactly 1 equilateral triangle is left. A square can never fill a gap in a grid made of 60° triangles because its 90° corners don't fit.
In a connection problem, the dot on Shape A sits on the CURVED edge of a semicircle, and the dot on Shape B is at the CENTER of a circle. One answer choice shows the line ending at the semicircle's straight (flat) edge but otherwise matches exactly. Why is this the best choice to eliminate?
Answer: The line attaches to the wrong edge of the semicircle, so the connection point has changed
A semicircle has two different kinds of edge: the curved arc and the flat diameter. The problem puts the dot on the arc, so a line ending on the flat edge connects to a different feature, and the drawing is wrong. Rotating the semicircle is fine, and lines can attach to curved edges.
Written and edited by Nathan Beja, founder of Practice Test Geeks, with AI assistance. Exam facts are checked against the official sources linked below. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- officialasvab.com — Exam format, score validity, score release, retake policy, passing score, test delivery, eligibility, exam information · verified Nov 2026