Under ASME NQA-1, what must a 'Corrective Action' program accomplish?
-
A
Document all quality inspections performed during fabrication
-
B
Identify, control, and correct conditions adverse to quality, with significant conditions requiring root cause analysis
-
C
Verify that all personnel hold valid qualification certifications
-
D
Report all deviations to the Nuclear Regulatory Commission within 24 hours