What does a 'Cumulative Flow Diagram (CFD)' primarily reveal about a Kanban system?
-
A
The velocity of each team member
-
B
The flow of work through each stage and the size of queues over time
-
C
The total number of features completed per sprint
-
D
The priority ordering of the backlog