  1. Under AIA A201, how long is the standard correction period for work found not in accordance with the contract documents?

    Answer: One year after substantial completion

    A201 sets a one-year correction period starting at substantial completion, separate from statutory warranty limits.

  2. A project team is investigating why recurring water intrusion occurs at window openings. Which tool best organizes potential causes by category?

    Answer: Fishbone (Ishikawa) diagram

    A cause-and-effect diagram groups possible root causes by categories like materials, methods, people, and environment.

  3. Which specification governs the installation and inspection of high-strength bolts in structural steel joints, including the turn-of-nut method?

    Answer: RCSC Specification for Structural Joints

    The RCSC specification defines pretensioning methods such as turn-of-nut, calibrated wrench, and DTI washers.

  4. What is the primary goal of building commissioning?

    Answer: To verify that building systems are designed, installed, and perform according to the owner's project requirements

    Commissioning is a quality process that verifies systems meet the OPR and are properly documented and operational.

  5. For acceptance testing, concrete cylinders made per ASTM C31 should be cured how?

    Answer: Standard-cured under controlled moisture and temperature after initial curing

    Standard-cured cylinders are used for strength acceptance, while field-cured cylinders assess in-place curing or formwork removal timing.

  6. Which test is commonly used to verify the watertightness of a newly installed horizontal waterproofing membrane before it is covered?

    Answer: Flood test

    A flood test ponds water on the membrane for a specified period, typically 24-48 hours, to reveal leaks.

  7. Which international standard specifies requirements for a quality management system that construction firms may be certified to?

    Answer: ISO 9001

    ISO 9001 is the quality management system standard; 14001 is environmental and 45001 is safety.

How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. aic-builds.org — Test delivery, late registration, test dates, renewal, eligibility, fees, exam format, time limit, exam information · verified Oct 2026