  1. Which repair method is most appropriate for restoring structural integrity to a dormant (non-moving) crack in a concrete beam?

    Answer: Epoxy injection

    Epoxy injection bonds the crack faces of dormant cracks and restores structural continuity.

  2. A crack in a slab-on-grade keeps opening and closing with temperature changes. What is the best repair approach?

    Answer: Rout and seal with a flexible elastomeric sealant

    Active cracks need a flexible sealant that can take the movement, because rigid fillers will re-crack.

  3. When repairing concrete spalled by corroding reinforcement, industry practice (e.g., ICRI guidelines) calls for:

    Answer: Removing concrete to create clearance behind the corroded bar, cleaning the steel, then patching

    Undercutting behind the bar (typically about 3/4 in. minimum) lets the repair material fully encase the cleaned reinforcement.

  4. White powdery deposits appear on a brick wall after heavy rains. What should the first maintenance step be?

    Answer: Find and stop the source of water moving through the masonry

    Efflorescence comes from water carrying soluble salts to the surface, so controlling the moisture source comes first.

  5. When repointing older soft brick masonry, the new mortar should be:

    Answer: Softer and more permeable than the masonry units

    Mortar that is softer than the units (e.g., Type N or O, lime-rich) prevents spalling of the brick because the mortar acts as the sacrificial element.

  6. Blisters forming in a built-up roof membrane are most commonly caused by:

    Answer: Trapped moisture or air between plies that expands with heat

    Moisture or air trapped between plies expands under solar heat and lifts the membrane into blisters.

  7. When replacing a failed sealant joint, why is a backer rod installed?

    Answer: To control sealant depth and prevent three-sided adhesion

    The backer rod sets the proper hourglass profile and depth and prevents three-sided adhesion, which causes premature failure.

How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. aic-builds.org — Test delivery, late registration, test dates, renewal, eligibility, fees, exam format, time limit, exam information · verified Oct 2026