← All AIC Flashcard Decks

Maintenance & Repair Procedures Flashcards

7 cards from real AIC practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 7 Maintenance & Repair Procedures flashcards as text
  1. A facility manager uses vibration analysis on pumps to schedule bearing replacement before failure. What maintenance strategy is this?

    Answer: Predictive maintenance

    Predictive maintenance uses condition-monitoring data such as vibration readings to schedule work just before failure is likely.

  2. What is the main purpose of a Computerized Maintenance Management System (CMMS)?

    Answer: Tracking work orders, asset histories, and preventive maintenance schedules

    A CMMS holds asset records, creates and tracks work orders, and automates PM scheduling.

  3. An owner lets non-critical light fixtures operate until they fail, then replaces them. This is best described as:

    Answer: Run-to-failure (corrective) maintenance

    Run-to-failure is a deliberate corrective strategy for low-cost, non-critical items where failure has little consequence.

  4. Which term describes maintenance and repairs that were needed but postponed because of budget limits?

    Answer: Deferred maintenance

    Deferred maintenance is work that was put off, and it builds up into a backlog of growing liability.

  5. Before servicing a machine that could unexpectedly energize, workers must follow which OSHA standard?

    Answer: 29 CFR 1910.147 Control of Hazardous Energy (Lockout/Tagout)

    OSHA 1910.147 requires energy-control procedures so that equipment is isolated and locked out before servicing.

  6. A maintenance metric that measures the average operating time between failures of repairable equipment is:

    Answer: MTBF

    Mean Time Between Failures (MTBF) measures reliability as the average run time between breakdowns.

  7. When are operation and maintenance (O&M) manuals normally turned over to the owner on a construction project?

    Answer: During project closeout before final payment

    O&M manuals, warranties, and as-builts are closeout deliverables that are usually required before final payment.

How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. aic-builds.org — Test delivery, late registration, test dates, renewal, eligibility, fees, exam format, time limit, exam information · verified Oct 2026