← All CCN1 Flashcard Decks

Unsafe Situations Procedure (RIDDOR) Flashcards

6 cards from real CCN1 practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 6 Unsafe Situations Procedure (RIDDOR) flashcards as text
  1. Under the Gas Industry Unsafe Situations Procedure (GIUSP), what classification is given to a gas installation that poses an immediate danger to life?

    Answer: Immediately Dangerous (ID)

    An Immediately Dangerous (ID) classification is given when a gas installation poses an immediate danger to life or property. When an engineer identifies an ID situation, they must disconnect or turn off the gas supply to the affected appliance immediately, attach a warning label, and advise the responsible person not to use the appliance.

  2. When a Gas Safe registered engineer classifies an appliance as 'At Risk' (AR), what action must they take?

    Answer: Advise the responsible person of the risk and seek their permission to disconnect; if they refuse, cap off and label the appliance

    For an At Risk (AR) classification, the engineer must advise the responsible person of the danger, recommend disconnection, and seek permission to isolate the appliance. If the responsible person refuses disconnection, the engineer must turn off the appliance, attach a warning label marked 'DO NOT USE', and confirm the situation in writing.

  3. RIDDOR stands for which of the following?

    Answer: Reporting of Injuries, Diseases and Dangerous Occurrences Regulations

    RIDDOR stands for the Reporting of Injuries, Diseases and Dangerous Occurrences Regulations 2013. Under RIDDOR, Gas Safe registered engineers have a legal duty to report any gas fitting or gas appliance that they consider to be dangerous to the extent that people could die, lose consciousness, or require hospital treatment.

  4. Under RIDDOR, who must a Gas Safe registered engineer report a dangerous gas fitting to?

    Answer: The HSE (Health and Safety Executive) via the online RIDDOR reporting system

    Under RIDDOR regulation 6(2), Gas Safe registered engineers must report any dangerous gas fitting to the HSE using the online reporting form at www.hse.gov.uk/riddor. The report must be made as soon as reasonably practicable. The gas transporter (e.g., National Gas Emergency Service) should also be notified if there is an immediate gas escape.

  5. An engineer discovers a gas boiler with a blocked flue that is spilling combustion products into the room. How should this be classified under GIUSP?

    Answer: Immediately Dangerous (ID)

    A blocked flue causing spillage of combustion products (including potentially lethal carbon monoxide) into the room is classified as Immediately Dangerous (ID). This poses a direct and immediate threat to life. The engineer must immediately turn off the appliance, disconnect it if necessary, attach a warning label, and advise the occupants of the danger.

  6. What does the classification 'Not to Current Standards' (NCS) mean under the GIUSP?

    Answer: The appliance does not meet current standards but is not immediately dangerous or at risk

    Not to Current Standards (NCS) means the gas installation or appliance does not comply with current regulations or standards but is not considered to be either Immediately Dangerous or At Risk at the time of inspection. The engineer should advise the responsible person of the non-compliance and recommend appropriate remedial action, but disconnection is not required.

How this page was made: written with AI tools and published by Nathan Beja, founder of Practice Test Geeks, who is responsible for its content. Exam facts are checked against the official sources listed below. Not reviewed by a subject-matter expert. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. igem.org.uk — Eligibility, test delivery, score validity, exam information · verified Nov 2026
  2. niceic.com — Exam format, renewal, retake policy · verified Oct 2026