Installation Procedures & Techniques Flashcards

7 cards from real AAI practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 7 Installation Procedures & Techniques flashcards as text
  1. What is the main concern when installing adhesive anchors in a downward-drilled hole that contains standing water?

    Answer: Water can stop the adhesive from bonding unless the MPII allows water-filled holes and specific steps are followed

    Only products qualified for water-saturated or water-filled conditions may be used, and only with the procedures in their MPII.

  2. For overhead or deep horizontal holes, which accessory helps fill the hole properly and keeps adhesive from running out?

    Answer: Piston plug with extension tubing

    A piston plug on extension tubing lets the hole fill from the back while back pressure pushes the nozzle out, limiting air voids and sag.

  3. After inserting an anchor overhead, how is the element kept from sliding out before the adhesive gels?

    Answer: Support it with wedges or a manufacturer-approved retaining device

    Overhead elements need temporary support so they don't slip or sag before gel time.

  4. Why is a wire brush of the correct diameter important during hole cleaning?

    Answer: It has to contact the hole walls to loosen dust stuck to them

    An undersized or worn brush won't scrub the walls, which leaves a dust film that cuts bond strength.

  5. What problem does a diamond core-drilled hole cause for many adhesive anchor systems?

    Answer: The smooth walls may give lower bond unless the MPII permits core drilling or requires roughening

    Many systems are qualified only for hammer-drilled holes, and core-drilled holes may need roughening or a specifically approved product.

  6. Which compressed air source is suitable for blowing out anchor holes?

    Answer: Oil-free compressed air at the pressure the MPII specifies

    Oil from a compressor contaminates the hole walls and reduces bond, so the air has to be clean and oil-free.

  7. What does a typical blow-brush-blow cleaning sequence accomplish?

    Answer: Removes loose dust, scrubs dust off the walls, then removes the loosened dust

    Each step removes a different kind of drilling debris so the hole walls are clean for bonding.

Written and edited by , founder of Practice Test Geeks, with AI assistance. Exam facts are checked against the official sources linked below. Editorial policy

Sources & references

Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy

  1. concrete.org — Fees, retake fee, test delivery, exam format, passing score, renewal, time limit, score validity, score release, eligibility · verified Nov 2026