On anchor drawings, the symbol "s" between two anchors typically represents:
Answer: Anchor spacing, center to center
In ACI 318 notation, s is the center-to-center spacing between anchors in a group.
A detail labels the anchor as installed overhead and resisting sustained tension. What does ACI 318 require for this installation?
Answer: Installation by a certified adhesive anchor installer
ACI 318 requires adhesive anchors installed horizontally or upwardly inclined under sustained tension to be installed by ACI/CRSI-certified personnel.
Which line type is normally used on drawings to show the centerline of an anchor or hole?
Answer: Long-short-long dashed line (chain line)
Centerlines are drawn with alternating long and short dashes, often marked with a CL symbol.
The structural drawings and the adhesive manufacturer's printed installation instructions (MPII) conflict on hole cleaning steps. What should the installer do?
Answer: Raise the conflict through the supervisor/engineer before proceeding
Conflicts must be resolved by the engineer of record, and the MPII is the basis of the product's qualified performance.
A plan note says "EQ. EQ." along a dimension string between two anchors and the plate edges. What does this mean?
Answer: The spaces are equal; divide the overall dimension evenly
EQ. indicates equal spacing, so the installer divides the total dimension into equal parts.
In a concrete section, which pattern typically represents cut concrete?
Answer: Stippled dots with small triangles
Concrete is conventionally hatched with dots and small triangles representing sand and aggregate.
While drilling at a location shown on the drawings, the bit hits reinforcing steel. Unless the documents explicitly allow it, what is the correct action?
Answer: Stop, and get direction from the engineer before cutting or relocating
Cutting rebar or relocating anchors changes the design, so the engineer must approve the remedy, which often includes filling the abandoned hole.
Written and edited by Nathan Beja, founder of Practice Test Geeks, with AI assistance. Exam facts are checked against the official sources linked below. Editorial policy
Sources & references
Exam facts on this page (fees, format, dates, passing scores) are checked against these official sources; the date is our last check. Editorial policy
- concrete.org — Fees, retake fee, test delivery, exam format, passing score, renewal, time limit, score validity, score release, eligibility · verified Nov 2026