Before conducting a flight under the A2 subcategory, what must the remote pilot complete?
-
A
Only a verbal briefing with a colleague
-
B
A documented pre-flight risk assessment including site survey
-
C
A flight plan filed with the CAA at least 24 hours in advance
-
D
A mandatory check-in with local air traffic control