In a wind turbine SCADA system, what does the term 'polling interval' refer to?
-
A
The time between scheduled maintenance checks
-
B
The frequency at which the SCADA system queries RTUs or PLCs for data
-
C
The interval at which wind speed is averaged for power curve calculations
-
D
The delay between a fault occurring and an alarm being triggered