A Part 107 remote pilot is hired to photograph a construction site. The site is within 5 miles of a public airport. Which step is required?
-
A
Obtain a Section 333 exemption
-
B
Receive ATC authorization via LAANC or FAA DroneZone
-
C
File a NOTAM at least 72 hours in advance
-
D
No action needed if operations remain below 400 feet