Airspace Regulations Flashcards
7 cards from real UAS practice questions. Tap to flip, then mark Knew It or Still Learning โ missed cards come back until you master them.
Read the first 7 Airspace Regulations flashcards as text
What is the maximum altitude a recreational drone operator may fly without authorization in uncontrolled (Class G) airspace?
Answer: 400 feet AGL
Under FAA rules, recreational and Part 107 drone flights are limited to 400 feet AGL in uncontrolled Class G airspace without a waiver.
Which airspace class surrounds the busiest commercial service airports and requires an ATC clearance before entry?
Answer: Class B
Class B airspace surrounds the nation's busiest airports and requires an explicit ATC clearance to enter.
A drone pilot needs to fly in Class D airspace. What is the correct procedure?
Answer: Obtain authorization via LAANC or DroneZone before flight
Class D airspace requires prior authorization, which UAS pilots may obtain through LAANC or the FAA DroneZone portal.
What color are Class B airspace boundaries depicted on a sectional aeronautical chart?
Answer: Blue
Class B airspace is depicted with solid blue lines on sectional charts.
Under 14 CFR Part 107, operating a sUAS in Class C airspace without authorization is:
Answer: A violation requiring FAA enforcement action
Part 107 prohibits UAS operations in Class C airspace without prior FAA authorization, and violations subject the pilot to enforcement.
Which tool provides near real-time airspace authorization for UAS operations in controlled airspace?
Answer: LAANC (Low Altitude Authorization and Notification Capability)
LAANC is the FAA's automated system providing near real-time UAS authorizations in controlled airspace.
A Temporary Flight Restriction (TFR) is issued over a wildfire. A Part 107 pilot wants to fly a news-gathering mission in the TFR area. What is required?
Answer: Obtain a specific waiver or authorization from the FAA before entering the TFR
TFRs prohibit all aircraft including UAS unless a specific FAA waiver or authorization is obtained before entry.