At what point in the trade show planning timeline should risk assessment ideally begin?
-
A
During the initial project scoping phase, well before the show date
-
B
One week before the show during final logistics review
-
C
On-site during build-out when actual conditions are visible
-
D
After the show, as a retrospective for future events