A tanker is preparing to load a volatile cargo at a terminal equipped with a Vapour Emission Control System (VECS). During the pre-transfer check, what is the most critical parameter to verify regarding the ship and shore vapor connection to prevent structural damage to the cargo tanks?
-
A
The diameter of the vapor hose is sufficient for the loading rate.
-
B
The pressure settings of the ship's P/V valves and the shore's control system are properly aligned.
-
C
The terminal has provided a certificate of compliance for their VECS.
-
D
The crew members connecting the hose are wearing appropriate respiratory protection.