In a Double Sampling Plan, what happens if the number of defectives in the first sample falls between the acceptance and rejection numbers?
-
A
The lot is immediately rejected
-
B
The lot is accepted without further inspection
-
C
A second sample is drawn and both samples are evaluated together
-
D
The entire lot undergoes 100% inspection