What is a permit-to-work system, and how does it relate to method statements?
-
A
A permit-to-work replaces a method statement entirely
-
B
A permit-to-work is a formal documented system for controlling high-risk activities, used alongside the method statement to ensure additional checks and authorisations are in place before work begins
-
C
A permit-to-work is only required for demolition
-
D
Permits-to-work are informal verbal agreements