A practitioner is reviewing a risk treatment plan and finds that the proposed control will reduce likelihood but NOT reduce consequence. What type of control is this?
-
A
A preventive control that reduces the probability of the threat event occurring
-
B
A corrective control that restores operations after an incident
-
C
A detective control that identifies incidents after they occur
-
D
A compensating control that replaces a failed primary control