โ† All SRE Flashcard Decks

On-Call Practices & Runbooks Flashcards

7 cards from real SRE practice questions. Tap to flip, then mark Knew It or Still Learning โ€” missed cards come back until you master them.

Read the first 7 On-Call Practices & Runbooks flashcards as text
  1. What is the recommended maximum sustainable on-call burden according to Google SRE best practices?

    Answer: No more than 25% of work hours spent on operational work

    Google SRE guidelines recommend limiting operational work including on-call to no more than 25% of an engineer's time to preserve capacity for engineering work.

  2. Which runbook section helps an on-call engineer determine whether an alert represents a real user-impacting issue?

    Answer: Impact assessment / severity criteria

    Impact assessment sections define thresholds and signals that distinguish genuine user impact from benign anomalies, guiding severity classification.

  3. An on-call rotation has only two engineers sharing duty. What is the primary risk?

    Answer: Burnout due to insufficient rotation depth

    Two-person rotations mean each engineer is on-call 50% of the time, which leads to fatigue and burnout without adequate relief.

  4. What is a 'war room' in the context of incident response?

    Answer: A physical or virtual space where all responders coordinate during a major incident

    A war room is a centralized coordination space (physical or virtual, such as a dedicated chat channel) where incident responders collaborate in real time.

  5. Which of the following is a key characteristic of a well-structured runbook step?

    Answer: It is actionable, specific, and includes expected outcomes

    Good runbook steps are written so an on-call engineer can execute them confidently, with clear actions and expected results to verify success.

  6. What is the role of an Incident Commander (IC) during a major outage?

    Answer: To coordinate responders, manage communications, and make prioritization decisions

    The Incident Commander coordinates the response, delegates tasks to specialists, and manages stakeholder communications without necessarily doing hands-on technical work.

  7. Why should runbooks avoid using vague language like 'check if the service looks healthy'?

    Answer: Vague steps create ambiguity, leading to inconsistent actions under pressure

    Ambiguous runbook language forces on-call engineers to interpret instructions during high-stress incidents, increasing the chance of error or delay.