What is the primary purpose of a diverter system installed at the wellhead during top-hole drilling?
Select your answer
A
Prevent blowouts by closing the BOP stack
B
Divert shallow gas flows away from the rig floor to protect personnel
C
Control mud weight during drilling
D
Seal the annulus against formation fluids