A transmission line experiences a sudden load increase. What is the FIRST control action a system operator should take to restore voltage?
-
A
Trip the overloaded line
-
B
Dispatch reactive power from nearby generators or capacitor banks
-
C
Reduce active power generation
-
D
Increase transformer turns ratio manually