A system operator observes a sudden voltage collapse on a transmission corridor. What is the FIRST corrective action to take?
-
A
Shed load in the affected area
-
B
Trip the transmission line to isolate the fault
-
C
Insert reactive power support such as capacitor banks or SVCs
-
D
Reduce active power generation on all units