During a widespread blackout, what is the correct sequence for restoring the transmission system?
-
A
Energize load first, then generation
-
B
Restore generation, establish transmission backbone, then pick up load
-
C
Pick up load incrementally before establishing transmission paths
-
D
Restore all feeders simultaneously to reduce restoration time