← All SMSTS Flashcard Decks

Quality Control Procedures Flashcards

7 cards from real SMSTS practice questions. Tap to flip, then mark Knew It or Still Learning — missed cards come back until you master them.

Read the first 7 Quality Control Procedures flashcards as text
  1. A subcontractor consistently fails to meet specified tolerances for brickwork joint width. The BEST long-term quality control response is:

    Answer: Raise a formal non-conformance, review the subcontractor's quality plan, and implement additional hold points

    Persistent non-conformances require a formal systemic response: documenting the issue, reviewing the subcontractor's processes, and adding inspection hold points to prevent recurrence.

  2. Material traceability on a construction site means:

    Answer: Being able to link installed materials back to their delivery records, test certificates, and batch numbers

    Traceability links every installed material to its supply chain documentation, enabling rapid investigation if a quality or safety concern arises.

  3. The term 'as-built drawings' refers to:

    Answer: Drawings updated to reflect how the works were actually constructed, including any approved changes

    As-built drawings are the final record of exactly how the structure was built, incorporating all approved variations and field changes.

  4. When carrying out a quality audit on site, what should the auditor primarily focus on?

    Answer: Whether the actual work processes and outcomes conform to the documented quality management system

    A quality audit assesses conformance of actual site processes and outputs to the documented quality management system requirements.

  5. What action should be taken when a non-conforming item cannot be brought into conformance?

    Answer: It should be formally dispositioned — either reworked, repaired under concession, or rejected and replaced

    Non-conforming items must be formally dispositioned through an approved process: rework to conform, accept under documented concession if the engineer agrees, or replace.

  6. Calibration of measuring and testing equipment on a construction site is important because:

    Answer: Uncalibrated equipment may give inaccurate readings leading to incorrect quality decisions

    Regular calibration ensures instruments give accurate readings; inaccurate measurements can cause defective work to be accepted or conforming work to be rejected.

  7. A 'concession' or 'deviation' in quality management allows:

    Answer: Use or release of a product that does not conform to requirements, after formal review and approval

    A concession is a formal, documented, engineer-approved acceptance of material or work that falls outside specification but is judged fit for purpose.