Under NEC 690.12, controlled conductors located outside the array boundary must be reduced to what level after rapid shutdown initiation?
Answer: 30 V within 30 seconds
NEC 690.12(B)(1) limits conductors outside the array boundary to 30 V within 30 seconds of initiation.
NEC 690.11 requires DC arc-fault circuit protection for PV system DC circuits operating at what voltage or greater?
Answer: 80 V
PV DC circuits operating at 80 V or greater require listed arc-fault protection per NEC 690.11.
What is the maximum PV system DC voltage permitted on one- and two-family dwellings under NEC 690.7?
Answer: 600 V
NEC 690.7 limits PV system DC circuits on one- and two-family dwellings to 600 V.
When sizing PV source circuit conductors, what combined multiplier is typically applied to module short-circuit current (Isc)?
Answer: 156%
NEC 690.8 applies 125% for irradiance and another 125% for continuous duty, giving 1.25 × 1.25 = 156%.
A panel has a 200 A busbar and a 200 A main breaker, with the PV breaker at the opposite end. Using the NEC 705.12 120% rule, what is the largest allowed PV backfed breaker?
Answer: 40 A
120% of 200 A is 240 A, so 240 A − 200 A main leaves 40 A for the PV breaker.
Per NEC 690.13, the PV system disconnecting means may consist of no more than how many switches or sets of circuit breakers?
Answer: Six
NEC 690.13 allows the PV system disconnect to consist of up to six switches or six sets of breakers.
What are the required functions of DC ground-fault protection for a PV array under NEC 690.41(B)?
Answer: Detect the fault, interrupt the faulted circuit, and indicate the fault
PV ground-fault protection must detect ground faults, interrupt the fault current path, and provide an indication of the fault.