โ† All SBCA Flashcard Decks

Equipment Setup Flashcards

7 cards from real SBCA practice questions. Tap to flip, then mark Knew It or Still Learning โ€” missed cards come back until you master them.

Read the first 7 Equipment Setup flashcards as text
  1. A Ku-band dish is experiencing rain fade during heavy storms. Which of the following is the most effective permanent mitigation strategy?

    Answer: Upgrade to a larger dish to increase antenna gain and link margin

    A larger dish provides higher antenna gain, increasing the system's link margin and improving rain fade resilience without changing the satellite signal itself.

  2. What is the recommended torque specification approach when tightening F-connectors to satellite receiver input ports?

    Answer: Maximum hand-tight plus a quarter turn with pliers

    Industry practice calls for finger-tight plus a quarter turn with a wrench to achieve a weatherproof, mechanically secure connection without over-tightening and damaging threads.

  3. When installing a dish mount on a non-penetrating roof mount (NPRM) with ballast, what is the primary structural concern?

    Answer: Adequate weight distribution to prevent wind uplift without exceeding roof load limits

    NPRM installations must balance enough ballast to resist wind loads against the roof's maximum allowable dead load per square foot.

  4. Which signal parameter is used to verify correct satellite transponder lock on a professional satellite receiver display?

    Answer: Bit Error Rate (BER) and Eb/No or C/N

    BER (Bit Error Rate) and carrier-to-noise (C/N or Eb/No) readings confirm that the receiver is locked to the correct transponder with sufficient signal quality.

  5. What is the purpose of inserting a DC blocking capacitor in a satellite IF coaxial line?

    Answer: Prevent DC voltage from the receiver from reaching components not designed to handle it

    A DC block prevents the 13/18 V DC supply voltage from the receiver from reaching downstream equipment such as splitters, meters, or other receivers not designed for powered lines.

  6. A technician is installing a dual-output LNB to feed two separate receivers. Both receivers require 18 V to select vertical polarization, but only one is receiving the correct signal. What is the most likely cause?

    Answer: One receiver is outputting 13 V instead of 18 V, selecting the wrong polarization

    If one receiver outputs 13 V (horizontal selection) instead of 18 V (vertical selection), it selects the wrong LNB polarization output and receives the incorrect channel set.

  7. When running coaxial cable through an exterior wall penetration, which installation practice is required to prevent moisture migration into the structure?

    Answer: Form a drip loop in the cable below the entry point before it enters the wall

    A drip loop routes the cable downward before it enters the wall so water runs off the cable rather than wicking into the building through the penetration.