A radiant heat subfloor system must be at what temperature before a carpet and pad system is installed over it?
-
A
Turned off completely for 24 hours
-
B
Running at maximum operating temperature for 48 hours then cooled to room temperature
-
C
Maintained at a steady 65°F throughout installation
-
D
Set to 50% output during installation only