  1. What type of conduit is required for a concrete-encased underground duct bank?

    Answer: PVC Schedule 40 or rigid metal conduit

    Concrete-encased duct banks typically use PVC Schedule 40 conduit for its corrosion resistance and smooth interior, or rigid metal conduit where additional mechanical protection is needed.

  2. What is the CEC requirement for identifying conductors that have been re-identified from their original colour?

    Answer: Apply tape or markers at each end and at every accessible point

    When re-identifying conductors (such as marking a white conductor as a switch leg), the CEC requires identification at each end and at every point where the conductor is accessible.

  3. What is the minimum bending radius for NMD90 cable?

    Answer: 5 times the cable diameter

    The CEC requires a minimum bending radius of 5 times the overall diameter of NMD90 cable to prevent damage to the conductors and insulation during installation.

  4. According to the CEC, what is the maximum height above finished floor for a receptacle outlet in a dwelling unit without being considered out of reach?

    Answer: 1700 mm

    Receptacles mounted above 1700 mm are generally considered out of reach for standard accessibility. The CEC and building codes set this as a practical limit for general-purpose outlets.

  5. What material is the armour of AC90 cable typically made from?

    Answer: Aluminium

    AC90 cable armour is typically made from interlocking aluminium strips, which provide mechanical protection while being lighter and more corrosion-resistant than steel armour.

  6. What is the CEC requirement for supporting horizontal runs of rigid PVC conduit?

    Answer: According to Table 12-22 based on conduit size

    CEC Table 12-22 specifies support spacing for PVC conduit based on trade size, with smaller sizes requiring more frequent support. The spacing ranges from 1.2 m to 2.4 m depending on size.