In ANSI/ASQ Z1.4, what happens to the sampling plan when a lot is submitted under tightened inspection and a second lot is rejected?
-
A
Inspection reverts immediately to normal
-
B
Production is halted until the issue is corrected
-
C
The sampling plan switches to reduced inspection
-
D
Acceptance of product is discontinued until corrective action is taken