Product Quality Management Flashcards
7 cards from real Product Management practice questions. Tap to flip, then mark Knew It or Still Learning โ missed cards come back until you master them.
Read the first 7 Product Quality Management flashcards as text
In quality management, what is the purpose of a 'control chart'?
Answer: Monitor process variation over time to detect anomalies
Control charts plot process metrics over time with upper and lower control limits to distinguish normal variation from significant anomalies.
Which quality management standard is most commonly referenced for product and organizational quality management systems?
Answer: ISO 9001
ISO 9001 is the internationally recognized standard for quality management systems, specifying requirements for consistent product and service quality.
A PM discovers that 30% of newly shipped features have bugs found by customers rather than QA. What does this indicate?
Answer: High defect escape rate
Defect escape rate measures how many defects pass through internal quality checks and reach customers, with a high rate signaling weak QA processes.
Which technique involves systematically releasing a product to a small percentage of users first to limit quality risk?
Answer: Canary release
A canary release deploys a new version to a small subset of users first, allowing teams to detect quality issues before full rollout.
What is 'technical debt' in the context of product quality?
Answer: Shortcuts taken in development that increase future maintenance cost
Technical debt refers to the implied future rework caused by choosing expedient solutions now instead of better, more time-consuming approaches.
A PM wants to ensure a feature works correctly under extreme load before launch. Which type of testing is MOST appropriate?
Answer: Stress testing
Stress testing evaluates how a system behaves under extreme conditions or loads beyond its normal operating capacity.
When using the DMAIC framework for quality improvement, what does the 'M' stand for?
Answer: Measure
In Six Sigma's DMAIC, 'Measure' involves collecting data on the current process to establish a baseline before improvements are made.