PC - Professional Electrical Contractor OSHA Safety Standards Questions and Answers 1

Free ยท Instant Results

An electrical contractor is setting up a temporary power supply on a construction site. According to OSHA standard 1926.404, what is required for all 120-volt, single-phase, 15- and 20-ampere receptacle outlets on construction sites that are not part of the permanent wiring of the building?