Notifiable Electrical Work (Part P) Flashcards

6 cards from real PART P practice questions. Tap to flip, then mark Knew It or Still Learning โ€” missed cards come back until you master them.

Read the first 6 Notifiable Electrical Work (Part P) flashcards as text
  1. What is an 'approved contractor' under Part P?

    Answer: A contractor registered with a government-approved Competent Person scheme for electrical work in dwellings, able to self-certify compliance with Part P

    An approved (or registered) contractor is one enrolled in an approved Competent Person scheme (e.g., NICEIC, NAPIT, STROMA) that allows them to self-certify Part P notifiable work without separately notifying Building Control.

  2. What happens if a homeowner carries out their own electrical work in a dwelling that is notifiable under Part P?

    Answer: They must notify their local authority Building Control before starting, who will arrange an inspection after completion; a fee is payable

    Homeowners can undertake their own notifiable electrical work but must notify their local authority Building Control department; Building Control then arranges a competent person or inspector to verify the work.

  3. What is the 'third party' notification route for Part P work carried out by an unregistered person?

    Answer: Notify the local authority Building Control before starting; an approved inspector or competent person verifies the work on completion

    When work is done by an unregistered person, the local authority Building Control must be notified before work starts (or as soon as possible in an emergency); they arrange verification of the completed work.

  4. Which of the following organisations operates a Part P Competent Person scheme?

    Answer: NICEIC (National Inspection Council for Electrical Installation Contracting)

    NICEIC is one of several government-approved bodies operating a Part P Competent Person scheme for electrical work in dwellings; others include NAPIT, ELECSA (now part of NICEIC) and STROMA.

  5. What work in a bathroom is always notifiable under Part P?

    Answer: Any addition or alteration to the electrical installation within a room containing a bath or shower

    Bathrooms are 'special locations' under Part P; any addition or alteration to the electrical installation in a room containing a bath or shower is notifiable work, regardless of the scale of the work.

  6. What is a 'special location' under Part P Building Regulations?

    Answer: A room or area with increased risk such as a bathroom, shower room, swimming pool, sauna, or outdoor electrical installation

    Special locations under Part P are those with a higher risk of electric shock or fire, including rooms containing a bath or shower, swimming pools, saunas, hot tubs, outdoor installations, and construction sites.