Read the following passage and answer the question. "Procedure P-501 outlines the response to a low-level alarm in Tank C. Upon receiving the alarm, the operator must first acknowledge the alarm on the control screen. Second, the operator must dispatch a field operator to visually verify the tank level using the local sight glass. The field operator must then report their findings back to the control room. If the low level is confirmed, the control room operator will start the backup transfer pump, P-10B. Under no circumstances should P-10B be started before visual confirmation is received." An operator in the control room receives a low-level alarm for Tank C. After acknowledging the alarm, what is the immediate next step?