A NETA technician is preparing to perform an acceptance test on a newly installed 15 kV, 100% insulation level, shielded power cable. According to NETA standards, which Very Low Frequency (VLF) withstand test parameters are correct?
-
A
10 kV DC for 15 minutes
-
B
22 kV rms for 15 minutes
-
C
34 kV DC for 10 minutes
-
D
19 kV rms for 30 minutes