A steel substrate was prepared for a critical immersion service coating. After abrasive blasting, the inspector notices dark, tightly adherent, bluish-black patches on the surface. What is this contaminant, and what is the primary risk if it is not removed?
-
A
Weld slag; it will create a brittle layer under the coating.
-
B
Soluble salts; they will cause osmotic blistering.
-
C
Mill scale; it can detach, leading to premature coating failure.
-
D
Oil and grease; they will prevent proper wetting of the surface.