According to NEC Article 690, which of the following is a primary requirement for the location of a PV system disconnecting means?
-
A
It must be within sight of the PV array.
-
B
It must be located on the roof within 6 feet of the array.
-
C
It must be installed in a readily accessible location.
-
D
It must be located exclusively inside the building near the main service panel.