An electrician must perform diagnostic work on a 480V motor control circuit that cannot be de-energized due to operational limitations. According to NFPA 70E, what is the minimum Arc Flash PPE Category required for this task?
-
A
PPE Category 1
-
B
PPE Category 2
-
C
PPE Category 3
-
D
PPE Category 4