A new building's water service pipe is being installed in a region with a known frost line depth of 18 inches. According to the IPC, what is the minimum required burial depth for this pipe to prevent freezing?
-
A
At least 12 inches below grade and at least 6 inches below the frost line.
-
B
Exactly at the frost line of 18 inches.
-
C
A minimum of 12 inches below grade, regardless of the frost line.
-
D
A minimum of 24 inches below grade to be safe.