During initial installation of an A2L split system, what ventilation requirement must be verified for the occupied space?
-
A
At least 4 air changes per hour
-
B
Ventilation sufficient to keep refrigerant concentration below the RCL
-
C
No mechanical ventilation is required
-
D
Ventilation equal to an A3 (propane) installation standard